A 5 minute read

Hiding the heating and air. A short guide for architects and designers.

Hidden equipment has to be planned at schematic design, because it is hard to change once framing starts. These are the decisions to make early.

A framed room with a fireplace and vent pipe installed in the far wall before drywall

Decide these at schematic design

  1. Where the air handler lives: a closet, attic or crawlspace with access for service and filters.
  2. Where the outdoor unit goes and how the refrigerant line gets there. Shorter is better for performance and cost.
  3. Where ducts run: above the ceiling or below the floor, in a chase that doesn't collide with the fireplace vent.
  4. Which diffusers you want: slot diffusers read as a shadow line, not a grille.
  5. Where the fireplace vent goes and how much clearance it needs.
Fig. A section through a room where the equipment stays out of sight.
  1. Air handler in a closet, with room to service it and change filters
  2. Ducts above the ceiling, in a chase that doesn't collide with the fireplace vent
  3. Slot diffusers read as a shadow line, not a grille
  4. The fireplace vent, planned with its clearances
  5. A short refrigerant line to the outdoor unit
  6. The outdoor unit, screened with slats but with clear airflow

Fireplace and HVAC conflicts

Vents, gas lines, ducts and framing all want the same chase. Planning both trades together avoids a redesign in the middle of framing. We run fireplace and HVAC as one project for that reason.

Outdoor units

  • Keep them away from bedroom windows, terraces and property lines.
  • Screen with slats or planting, but leave clear airflow. A solid enclosure makes a unit work harder.
  • On the coast, ask about corrosion protection.
  • Check design review and association rules for the visible equipment.

Code touchpoints

  • Energy code duct testing and verification on most replacements.
  • Fire sprinkler and roofing requirements in some fire districts for larger additions.
  • Natural gas restrictions in new construction in some jurisdictions.
Questions

Common questions.

Anything else, call or text me.

How early should we bring in the HVAC contractor?

At schematic design. Equipment locations and chases are hard to change once framing starts.

Can ducts really be hidden?

Usually. Ducts go above the ceiling or below the floor, and slot diffusers keep the rooms clean.

Do you work with architects and designers?

Yes, we coordinate with architects, designers, agents and house managers.

Contact

Call or text Jeremy.

Tell me about the room or the system and we'll set up a free estimate. For a repair, text me a photo of the unit first. It often saves a trip.

(805) 699-1112
Address
511 E Gutierrez St, Santa Barbara, CA 93103
Hours
Call or text to schedule. After-hours appointments when a technician is available.
Estimates
Free, with flat rate pricing
Serving
Santa Barbara County: Santa Barbara, Goleta, Hope Ranch, Montecito, Summerland, Carpinteria, Santa Ynez, Solvang and Buellton
License
CSLB Lic. #1086420 (C-20), active. Workers' comp insurance on file with the CSLB.
Call Text